The second challenge was providing a temporary solution that didn’t require any permanent or mechanical fixings for installation. SignManager alongside the contractor worked to ensure that a visually pleasing solution was presented, and after the event the temporary signs could be removed without damaging the venue’s existing signs and walls.
This special project came with one final challenge, which was access restrictions at the venue. Installers had only four hours in the morning the day of the lunch to carry out the installation. The signs were installed for a total of four hours and removed after the lunch within a period of two hours.
Thorough planning resulted in a successful installation and removal within the tight timeframe. CUB were extremely satisfied with the outcome.